Strength
Compression Load and Deflection
Aluminum SHIM-ME specimens loaded in a compression frame in three configurations: lowest position, raised on 2 teeth and raised on 4 teeth. Load and displacement were recorded for each specimen.
Specs
Sizes, heights, parts and options, with the test files and documents behind them.

Strength
Aluminum SHIM-ME specimens loaded in a compression frame in three configurations: lowest position, raised on 2 teeth and raised on 4 teeth. Load and displacement were recorded for each specimen.

Thermal
Type K thermocouples on the frame side and the base side of the assembly, with dry ice at about −109°F as the cold source. The frame side stayed significantly warmer than the base side.

3M VHB
The optional tape locks the base while you set the unit. Bond values are in the manufacturer's datasheet.
Then vs. Now


| Topic | Then: Stacked Shims | Now: SHIM-ME |
|---|---|---|
| Setting the Height | Then:Loose pieces stacked and trimmed at every opening | Now:Set notch by notch, about 1/16" at a time |
| Under Load | Then:Crush and settle over time | Now:Parts interlock into one solid aluminum unit |
| Drainage | Then:Clog the drainage path, causing leaks and stucco cracking | Now:Clear drainage path |
| Who Installs It | Then:Needs your most experienced installer | Now:Any crew member levels it on the first try with a tape measure and a level |
Fewer leak callbacks. Fewer warranty claims. Doors stay square.
The Labor Math
Estimates, from the calculator: up to 2 hours saved for every 8 linear feet of install, at $50 per hour.
Use the Calculator| Linear feet | Hours saved | Labor saved |
|---|---|---|
| 8 ft | 2 hrs | $100 |
| 50 ft | 12.5 hrs | $625 |
| 100 ft | 25 hrs | $1,250 |
| 300 ft | 75 hrs | $3,750 |
Thermal Performance
The optional thermal break adds an insulating barrier between the slab and the frame. In the thermocouple test, the frame side stayed significantly warmer than the base side.
See the Thermal Test →
FAQ
2", 3", 4", 5" and 6" unit widths in stock, plus custom X sizes on request.
Ask About a Custom Size →It's optional and available on every size. It sits on top of the assembly, under the window or door rail.
The optional 3M VHB Tape 5962 locks the base while you set the unit. Bond values are in 3M's datasheet.
Open the Datasheet →15,000 lbs rated load. The compression test data is on this page.
See the Strength Data →UPS Ground from Boise, Idaho.
Within 30 days, on unused units with the tape intact.
No. SHIM-ME anchors to the sill pan; it doesn't replace sill pans or other required components.