SHIM-ME

Installation

Install SHIM-ME in Four Steps.

All you need is a tape measure and a level.

What's in the Unit

Four Parts. One Unit.

The parts interlock into one solid unit.

Exploded render of a SHIM-ME unit: base plate, base wedge, adjustable wedge, extension and thermal break
  1. 1

    Base Plate

    Anchors to the sill pan, flat face down.

  2. 2

    Wedge

    The base wedge slides onto the plate; the adjustable wedge moves notch by notch, about 1/16" each, from 1¼" to 1¾".

  3. 3

    Extension

    Optional. Adds height for openings that need more than 1¾".

  4. 4

    Thermal Break (Optional)

    Sits on top of the assembly, under the window or door rail.

Choose the Required Width. Check your window or door opening for the required width. The SHIM-ME width should fit your sill pan (pan not included). Custom sizes available.

Max Base-Plate SpacingEdge to edge
8"
Lowest HeightWedge fully nested
1 1/4"
Max Adjustable HeightBefore extension
1 3/4"
Per NotchHeight adjustment step
1/16"

Spacing Rule

Where Each Unit Goes.

Place the first base plate a couple of inches from the corner, then space the rest no more than 8" apart, edge to edge. Closer is fine. Never further.

Work Out How Many You Need →
DOOR / WINDOW BOTTOM TRACK8" max, edge to edge

Step by Step

Measure. Position. Adjust. Lock In.

  1. SHIM-ME units laid out under a frame on a sill
    Layout, product render

    Step 1: Measure

    Measure the opening and mark your layout using the spacing rule.

  2. SHIM-ME aluminum base plate with four raised rails
    Base plate, product render

    Step 2: Position

    Set the base plates on the sill, the first one a couple of inches from the corner, then no more than 8" apart, edge to edge.

  3. Aluminum SHIM-ME wedge profiles in cross-section, showing the notched faces that interlock
    Wedge profiles, product render

    Step 3: Adjust

    Slide the wedge onto the base and move it notch by notch, about 1/16" each, from 1¼" up to 1¾". Add the extension if you need more height.

  4. Assembled SHIM-ME unit with anchors through the base plate
    Assembled unit, product render

    Step 4: Lock In

    The parts interlock into one unit. Fasten with 3M VHB tape or anchor through the base plate, add the optional thermal break, then set the door or window.

Full Steps from the Installation Manual
  1. 01

    Installing the Base Plates

    Locate the sill pan and place it over the location where you intend to install your door or window. Lower it slowly and set it into place, then locate the corner and place the first base plate.

    • Place the base plate a couple of inches from the end, flat face facing down.
    • Drill the two anchor holes with a power drill and a 1/4" bit.
    • Secure the base plate using anchors suited to your application — check your project requirements for the correct type.
    • Repeat for the remaining base plates, spacing each set at a maximum of eight inches edge to edge.
    • Fully secure all base plates, then apply waterproofing — make sure both the anchors and the base plates are fully sealed.
  2. 02

    Installing the Base and Adjustable Wedge

    The base wedge slides onto the base plate. Set it in front of the plate, match the bottom slots, and slide it into place flush with the base plate.

    • Secure the base wedge with the provided screw and tighten fully with a Phillips screwdriver.
    • Attach the adjustable wedge by sliding it onto the base wedge, matching the slots.
    • Sliding the wedge to fully cover all grooves sets the lowest possible height — about 1 1/4".
    • To raise it, pull the adjustable wedge out and slide it to the next notch. Each slot adjusts the height by about 1/16".
    • The maximum adjustable height is about 1 3/4". Measure from the top of the shim assembly to the finished floor with a tape measure.
    • Once at the required height, secure the adjustable wedge to the base wedge with the provided screw and tighten fully.
  3. 03

    Installing the Optional Extension and Thermal Break

    The assembly can be extended for extra height. SHIM-ME includes a half-inch extension for projects that need to go past 1 3/4". If no extension is required, skip to the thermal break.

    • To fit the extension, slide it onto the adjustable wedge, matching the notches, and secure it with the provided screw.
    • The thermal break installs either to the half-inch extension or directly to the adjustable wedge.
    • Slide the bottom notches onto the assembly, ease it into place, and secure it with the provided screw.
    • Repeat for the remaining SHIM-ME assemblies as required.
  4. 04

    Installing the Window or Door Rail

    Once every assembly is fully secured and waterproofed, you can fit the rail. Place the bottom window or door rail on top of the SHIM-ME assemblies and lower it slowly into place over the thermal break.

    • Secure the rail using the required anchors, inserting them through the rail and into the SHIM-ME assemblies.
    • Fully secure the anchors as required.
    • Install windows or doors per your project specifications.

Install Video

Watch the Full Install.

See All Videos →

Applications

Under the Rail, Before the Frame Goes In.

Render of SHIM-ME units set under a frame on a sill
Product render
  • Commercial Windows

    Set under the window rail before the window is installed.

  • Sliding Glass Doors

    Supports the bottom rail of sliding units.

  • Commercial Door Systems

    Installed under the door rail before the door system.

  • Thermally Broken Frames

    Pair it with the optional thermal break under the rail.

  • Storefront Systems

    Set under the storefront frame before the system goes in.

  • Heavy Machinery Leveling

    Leveling support under machinery.

  • Other Applications

    Have a different support need? Send us the details and we'll tell you whether SHIM-ME fits.

    Ask a Technical Question

Install FAQ

Quick Answers.

What If My Opening Doesn't Divide Evenly?

Use the custom X size. It isn't stocked, so send us the opening dimensions and we'll spec it for you.

Send Us Your Plans →
Who Can Install It?

Any crew member. No lead installer needed: set the height with a tape measure and a level.

Does It Replace the Sill Pan?

No. SHIM-ME anchors to the sill pan. The sill pan, anchors and waterproof sealant aren't included.

What Tools Do I Need?

A tape measure and a level to set the height. To anchor the base plates, the manual also lists a power drill with a 1/4" bit and a Phillips screwdriver.

Use alongside the manufacturer's installation instructions. SHIM-ME doesn't replace sill pans or other required components.

Important Safety Warnings: Make sure to install the SHIM-ME as level as possible. Install the number of SHIM-ME units required to support the system. Some assistance may be required.